Back to blogs

Residual-current protection: 30 mA and 300 mA, what goes where?

February 11, 2026By Voltuno

The residual-current device is one of your most important protections against fire and electric shock. But when is 300 mA enough, and where is a 30 mA RCD required?

Regulations
Residual-current protection: 30 mA and 300 mA, what goes where?

The residual-current device, or RCD, is one of the most important protections in a home. It measures whether current is “leaking” — for example through a faulty appliance or when someone touches a conductor — and switches off very quickly. AREI (Book 1, Part 4 — Protective measures) defines which sensitivity is required for each type of circuit.

300 mA versus 30 mA

  • 300 mA (general): is placed at the origin of the installation and mainly protects against fire caused by insulation faults.

  • 30 mA (high sensitivity): protects people against electric shock and is required for wet or higher-risk circuits.

In recent AREI versions, more circuits must be protected by a 30 mA RCD.

Which circuits behind 30 mA?

CircuitRequired RCD
Complete installation (origin)300 mA
Bathroom — all circuits30 mA
Laundry room and damp rooms30 mA
Outdoor sockets30 mA
Dishwasher, washing machine, dryer30 mA
Socket circuits (≤ 20 A)30 mA

Practical tips

  • Test every RCD monthly with the test button (T).

  • Spread circuits across several 30 mA RCDs so that one fault does not switch off the entire home.

  • An RCD does not replace a circuit breaker: you need both — the breaker for short circuits and overloads, the RCD for leakage current.

How Voltuno helps

A good distribution of RCDs and circuits starts with a clear diagram. With Voltuno, you draw a correct single-line diagram, position diagram and matching bill of materials in minutes. Our software is built around AREI requirements, so you can work faster and prepare inspections with a clear, complete file.

Please note: this article is a general explanation and not legal advice. Always consult the official, consolidated AREI text (FPS Economy) for the exact obligations and article references.